Seamless Supplier
Transfer, Zero Downtime.
Switch your baby product manufacturing to YMS without disrupting your supply chain. We take over existing molds, drawings and processes -- then validate, optimize, and scale production with 15 years of OEM/ODM expertise.
End-to-End
Mold Transfer
Audit, transfer, validate -- with full documentation and risk control.
Downtime
Step 01
Existing Product & Supply Assessment.
Before any transfer, we deeply understand your current situation -- the pain points, quality gaps, delivery issues and cost pressure driving the change.
Quality Issues
Identify defect rates, inconsistency, material concerns from current supplier.
Lead Time
Review current delivery performance, delays and seasonal supply risks.
Cost Structure
Benchmark current pricing, identify savings and value-engineering opportunities.
Compliance Gaps
Audit current certifications: FDA, LFGB, CE, RoHS, REACH compliance.
Step 02
Receive Drawings, Samples & Quality Files.
Our engineering team collects, catalogues and verifies all critical documentation before any physical transfer begins -- ensuring nothing is lost in translation.
2D / 3D Engineering Drawings
CAD files, tolerance specifications, assembly instructions.
Golden Samples & References
Physical reference products for color, texture, and functional benchmarking.
QC Standards & Test Reports
Inspection criteria, acceptance limits, previous certification reports.
Packaging & Labeling Specs
Artwork, barcodes, carton specs, and shipping requirements.
Step 03
Existing Mold Condition Inspection.
A full technical audit of incoming molds -- identifying wear, damage, and remaining lifespan before they enter our production floor.
Visual & Dimensional Audit
- ✦ Surface wear and corrosion
- ✦ Cavity integrity check
- ✦ Dimensional accuracy (±0.1mm)
Functional Testing
- ✦ Cooling system check
- ✦ Ejection mechanism
- ✦ Parting line condition
Full Audit Report
Detailed written report covering mold life expectancy, recommended repairs, and risk level -- delivered within 5 working days.
Step 04
Mold Transfer, Trial Run & Rework.
Molds are received, cleaned, installed, and trialed on YMS production equipment. Where necessary, we rework or refurbish them to extend lifespan and improve output quality.
01
Receiving & Cleaning
Unpack, inspect, deep-clean every cavity.
02
Installation
Fit to matched press and verify parameters.
03
First Trial (T1)
Run trial shots, measure, document results.
04
Rework & Approve
Polish, repair, re-trial until approved.
Step 05
Material & Process Reconfirmation.
We re-verify every input -- raw silicone grade, pigment, additives, curing time and injection parameters -- ensuring the transferred product exactly matches the original specification, or improves on it.
100% Food-Grade Silicone
LSR or HTV selected based on product requirement, verified against FDA/LFGB.
Process Parameter Lock
Temperature, pressure, cycle time documented and version-controlled.
Post-Processing Alignment
Punching, bonding, oil spray, silk printing, pad printing, UV coating.
Step 06
Side-by-Side Sample Comparison.
Transferred samples are rigorously compared against the original -- ensuring parity on every dimension that matters.
Dimensional
Full measurement report, tolerance within ±0.1mm.
Appearance
Color matching, surface finish, print alignment.
Performance
Tensile, tear, aging, temperature resistance.
Safety
Food-contact, migration, odor and BPA-free testing.
Step 07
Pilot Run & Mass Production Launch.
A controlled small-batch run proves the entire production chain before we ramp up to full volume -- minimizing risk at scale.
Pilot Validation (500-2,000 pcs)
Scope
Full production simulation
Duration
5-10 working days
Inspection
100% full check
Output
Validation report + samples
After pilot approval, we lock the production SOP and begin scheduled mass production with weekly status reporting to the client.
64
Production machines ready for scale
Step 08
Quality, Delivery & IP Risk Control.
A transfer is not complete until all risks are contained. We put formal protection in place for your product, timeline and intellectual property.
Quality Risk
- ✦ ISO 9001 production SOPs
- ✦ 100% full inspection
- ✦ Tensile, aging, tear testing
- ✦ AQL sampling per shipment
Delivery Risk
- ✦ Transfer timeline contract
- ✦ Weekly production reports
- ✦ Buffer stock during switch
- ✦ Multiple parallel lines
Documentation & IP
- ✦ Signed NDA before transfer
- ✦ Mold ownership documented
- ✦ Version-controlled drawings
- ✦ FDA / LFGB / CE / RoHS
Step 10 -- Get Started
Submit Your Supplier Transfer Request.
Share your current product, existing mold details and challenges. Our transfer team will reply within 24 hours with a tailored assessment plan.
Phone / WhatsApp
+86 134 1898 3587